|
LIST OF ONGOING SCHEMES
|
|
Roads & Bridges
|
|
Financial Rs. in Lakhs
|
|
Sl. No.
|
Name of Scheme
|
Requirement of fund for completion
|
|
1
|
2
|
3
|
|
DIVISION : TAWANG (District :- Tawang)
|
|
1
|
RLR from Jang-Mukto road to Mirbavill.
|
19.19
|
|
2
|
RLR from BRTF road (Lhou Bazar) Singsur Ani Gompa Via Secondery School Lahu
|
15.52
|
|
3
|
RLR from JMKS road 56.00 Km Point to Tsaighar Gyada vill via Gormang & Yusum (Ph-I).
|
19.79
|
|
4
|
C/o C. C. drain on RLR from Shernup to Chaksam
|
18.17
|
|
5
|
C/o C. C. drain on RLR from Lhou Jangda road to Shyro
|
13.25
|
|
5
|
TOTAL (Tawang Division)
|
85.92
|
|
DIVISION : SINGCHUNG (District : West Kameng)
|
|
1
|
C/o RLR from U/Dzong to Sachipam vill. (Ph-I)
|
13.82
|
|
2
|
C/o WRSB over Dinikho river to connect Rupa & Thungri vill
|
18.32
|
|
3
|
WRSB at Ditching river in Dugokho under RWSD, Bomdila
|
12.61
|
|
4
|
C/o WRSB over Tenga river at New Kaspi vill.under Singchung div.
|
12.46
|
|
5
|
RLR from Nafra to Upper Dzong vill Ph II
|
11.28
|
|
6
|
C/o CC drain along the road from Rupa to Thungri and 3 nos slab culvert
|
13.13
|
|
7
|
C/o RLR from Jigaon to Membachur vill.
|
12.51
|
|
8
|
Improvement of RLR from Shergaon to Zinbu Gompa i/c.B/topping
|
12.28
|
|
8
|
TOTAL (Singchung Division)
|
106.41
|
|
DIVISION : SEPPA (District : East Kameng)
|
|
1
|
RLR from Pipu to Jote Cheda
|
16.38
|
|
2
|
C/o WRSB over Kameng river in between 18 mile camp & Talo vill
|
23.43
|
|
3
|
C/o RLR from Sangbia camp to Paffa vill.(Ph-I)
|
23.00
|
|
4
|
C/O RLR Lachinng Bagang to Tamak –Solung
|
19.79
|
|
5
|
C/O RLR from Jokhio to Nampe
|
23.85
|
|
6
|
Black topping of RLR from BRTF road point to Veo vill.
|
15.22
|
|
6
|
TOTAL (Seppa Division)
|
121.67
|
|
DIVISION : POMA (District : Papumpare)
|
|
1
|
RLR from Kimin main road Bridge point to Kakoi vill.
|
26.47
|
|
2
|
C/o WRSB over Dikrong in between Chiputa Tomru under Dimukh Ph-I
|
13.19
|
|
3
|
WRSB over Ganga river at Mobsi vill.
|
20.21
|
|
4
|
WRSB to Popum river in between Longdung school and Byate
|
20.22
|
|
5
|
WSB to Popum river in Lower Taraso to Upper Taraso
|
21.69
|
|
6
|
Steel bridge over Rillo river at Poma
|
19.70
|
|
7
|
C/o WRSB in between Basar Nallah I.B school & Mobiaso vill. over Papum river.
|
17.59
|
|
8
|
C/o WSB steel bridge over Papu river between Ompoli to Papasu.Ph-I
|
18.51
|
|
9
|
C/o RLR from BRTF road to Bobia (Ph-II)
|
26.28
|
|
10
|
C/o WRSB over Parang river at Sima & Gumtung vill.
|
19.17
|
|
11
|
C/o WRSB over river Pare at Lower Gai ( Span 70mtr)
|
25.95
|
|
11
|
TOTAL (Poma Division)
|
228.98
|
|
DIVISION : ZIRO (District : Lower Subansiri)
|
|
1
|
C/o RLR from BRTF road to Se-Godak.
|
21.28
|
|
2
|
C/o RLR from Boa Simla to Chimerhipu
|
8.17
|
|
3
|
C/o RLR from Yatap to Bomte (Ph-I)
|
9.76
|
|
4
|
C/o RLR from Molyang to Sikhe.
|
10.90
|
|
5
|
C/o RLR from RagaHospital to Habakabak (Ph-I).
|
9.30
|
|
6
|
C/o RLR from BRTF road to Raipari vill.
|
16.78
|
|
7
|
C/o RLR from Dugi to Yukar.
|
33.08
|
|
8
|
C/o RLR from Linia to Restoriang (Ph - I)
|
13.75
|
|
9
|
C/o RLR from Siro primary school to Naropakho.
|
5.27
|
|
10
|
Imp. of road from main Hapoli to Sibe vill. (Ph - I)
|
14.60
|
|
11
|
Imp. of RLR from Tamin to Rite Simla.(Ph - I)
|
20.62
|
|
12
|
Imp. of RLR from Boa Simla to Gaa vill. (Ph - I)
|
6.62
|
|
13
|
C/o RLR from Deed Mangio road to Kugi Tago primary school (Ph-I)
|
5.60
|
|
14
|
C/o RLR from Sibe vill. to SIB Colony (Ph-I)
|
6.94
|
|
15
|
C/o RLR from Buru happa to Loko Talo
|
11.81
|
|
15
|
TOTAL (Ziro Division)
|
194.48
|
|
DIVISION : LAAYING YANGTE (District : Kurungkumey)
|
|
1
|
C/o RLR from 5 Km. Point Ziro Palin road to Tassar.
|
17.33
|
|
2
|
C/o RLR from Nyapin to Leba
|
24.15
|
|
3
|
C/o RLR from 12km. point to Kuru Bridge Nongram.
|
73.62
|
|
4
|
C/o approach road to Chambang town to M.E.school. (Ph-I)
|
5.72
|
|
5
|
C/o RLR from Gaga to Logthe Loth (Ph-II)
|
26.02
|
|
6
|
C/o WRSB over Nyokoriang over Kamla river at Pillo under RWSD, Koloriang.
|
18.63
|
|
7
|
C/o WRSB over Kamla river at Tamin in between Se-riang and Nyukoring
|
29.39
|
|
7
|
TOTAL (Laaying yangte Division)
|
194.86
|
|
DIVISION : DAPORIJO (District : Upper Subansiri)
|
|
1
|
C/o RLR Koyak point to Diri
|
52.48
|
|
2
|
C/o RLR Kodak H.S. school to Duchuk.
|
48.75
|
|
3
|
C/o CC step cum foot path to inner link RWD bldg.of RWD complex at Kodak
|
3.60
|
|
4
|
Soling & metaling of RLR from main road to Ango Lamdak
|
20.13
|
|
5
|
C/o RLR from PWD main road to Cikompate Mission school
|
22.48
|
|
6
|
C/o RLR from Old Rachi to Belo via Togogi
|
11.41
|
|
6
|
TOTAL (Daporijo Division)
|
158.85
|
|
DIVISION : ALONG (District : West Siang)
|
|
1
|
RLR from Tabasora to Rime.
|
33.00
|
|
2
|
RLR from Rana Ghat to Rumgong PWD road to Mori vill.
|
16.16
|
|
3
|
C/o WRSB over Siyum river at Kabu vill.
|
22.96
|
|
4
|
RLRfrom BRTF road to Darka Mobuk Putu
|
13.98
|
|
5
|
RLR from Jirdo to Zime I.
|
21.52
|
|
6
|
RLR from 17 KM bridge Point LKB-ALG road to Kane
|
39.70
|
|
7
|
RLR from Hollung to Dambasis.
|
21.49
|
|
8
|
RLR from Poyom to New Boruraksap.
|
21.04
|
|
9
|
RLR from PWD road to Akkar Yomgam .
|
11.46
|
|
10
|
Steel S/B between Daba Gamlin and Yomcha.
|
7.20
|
|
11
|
RLR from Payum vill to C.O. HQ.
|
7.16
|
|
12
|
RLR from PWD road to Degi Pottom via M.E.school.
|
9.12
|
|
13
|
C/o WRSB over See river between BRTF road to Yegri vill.
|
9.86
|
|
13
|
TOTAL (Aalo Division)
|
234.65
|
|
DIVISION : YINGKIONG (District : Upper Siang)
|
|
1
|
RLR from Yingkiong Lagru road to Bimik area at Gobuk
|
29.51
|
|
2
|
Soling/Metalling and Carpeting of RLR from BRTF road to Simong
|
37.66
|
|
3
|
C/o Rlr from Ykg- Mrg PWD road to Bentuk vill
|
35.07
|
|
4
|
RLR from Kinning at Longkey via Pattying
|
33.26
|
|
5
|
RLR from Ongong BRTF road to Old Tuting
|
42.77
|
|
6
|
RLR from PWD road to Likor vill (Ph-I)
|
16.23
|
|
6
|
TOTAL (Yingkiong Division)
|
194.50
|
|
DIVISION : PASIGHAT (District : East Siang)
|
|
1
|
WRSB over Remi river between Miren and Sika WRC field
|
15.32
|
|
2
|
Imp. hard surfacing / black topping of approach road to SE circle office complex RWD, Pasighat
|
10.56
|
|
3
|
RLR from P.P. road to Radha vill.
|
42.81
|
|
4
|
RLR from Ruttung to Katlek vill
|
25.63
|
|
5
|
WRSB over Siang river in between Yambung and Pangin
|
13.91
|
|
5
|
TOTAL (Pasighat Division)
|
108.23
|
|
DIVISION : ROING (District : Lower & Upper Dibang Vally)
|
|
1
|
C/o approch road to DIET Center i/c New RWD complex, i/c B/topping,culverts, R/walls, plantation at Roing.
|
12.33
|
|
2
|
B/topping of RLR from Iduli to Kabang vill.
|
14.09
|
|
3
|
C/o RLR from Angolin to Kadeli vill
|
31.02
|
|
3
|
TOTAL (Roing Division)
|
57.44
|
|
DIVISION : TEZU (District : Lohit)
|
|
1
|
C/o 1 no. RCC bridge over Naku nallah at Kaisu
|
5.12
|
|
2
|
C/o 1 no. RCC bridge at the junction bridge point of Oil India road near Nangtaw Shyam vill
|
3.61
|
|
3
|
Suspension bridge over Kamfai river under Wakro circle
|
26.98
|
|
4
|
RCC bridge at Jona at Ch 500mtr
|
22.45
|
|
4
|
TOTAL (Tezu Division)
|
58.16
|
|
DIVISION : HAWAI (District : Anjaw)
|
|
1
|
C/o RLR from BRTF road Lautul point to Ruti vill.via Nahil & Kandail
|
16.13
|
|
2
|
Imp. of RLR from Paya bridge point to Paya vill.
|
13.48
|
|
3
|
C/o mule track from Paya bridge point to Lamaliang
|
7.07
|
|
4
|
C/o WRSB over Kulung to connect Sherang & Krowti (span-110 m)
|
10.91
|
|
5
|
C/o RLR from BRTF road to Chingra vill.
|
8.82
|
|
6
|
C/o RLR from BRTF road to Komgra vill (Ph-I) (1.0 Km)
|
13.59
|
|
6
|
TOTAL (Hawai Division)
|
70.00
|
|
DIVISION : CHANGLANG (District : Changlang)
|
|
1
|
C/o RLR from Yanman to Lungchuk (Ph-II)
|
13.00
|
|
2
|
WRSB over Dehing river between Buddhist Mandir to Vijoynagar .
|
49.90
|
|
3
|
Imp. and black topping of RLR from MJ road to New Khimiyang
|
6.83
|
|
4
|
B/topping of RLR from Bordumsa Namchik PWD road to Balinang
|
7.32
|
|
5
|
RCC culvert with steel structure over Simrang stream of RLR from MC road to Renuk
|
7.13
|
|
5
|
TOTAL (Changlang Division)
|
84.18
|
|
DIVISION : KHONSA (District : Tirap)
|
|
1
|
C/o RLR from Luthong to Borduria
|
13.57
|
|
2
|
C/o RLR from Mopaya to Kenon (Ph-I )
|
8.05
|
|
3
|
C/o RLR from Longkhong to Washathong (Ph-I)
|
15.89
|
|
4
|
RLR from Laho to Old Kothin (Ph - 1)
|
10.00
|
|
5
|
C/o of B/wall, R/wall U/Kolam to L/kolam road.
|
16.00
|
|
6
|
C/o RLR from Konnu-II to Khasa vill.(Bonia)
|
13.59
|
|
7
|
C/o RLR from Tissa - Wakka road to Nginu vill (upper Vill)
|
15.00
|
|
8
|
C/o RLR from Lawnu to Chopsa vill
|
20.00
|
|
9
|
C/o RLR Longding - Senua road to L/ Senua vill
|
15.00
|
|
9
|
TOTAL (Khonsa Division)
|
127.10
|
|
109
|
Grand total
|
2025.43
|